Mar 4, 2026
In this episode of the Contractor Growth Network Podcast, Logan sits down with Barry Gant and Änd Lynn from Seven Day Kitchens to unpack one of the most unusual remodeling business models in the industry: a full kitchen remodel completed in seven days or less.
From the outside, it sounds impossible. Most kitchen remodels take 8–12 weeks and leave homeowners living in a construction zone the entire time.
But Barry explains how their company achieves the seven-day timeline—not through shortcuts, prefab materials, or cosmetic updates—but through extreme planning, specialized teams, and eliminating the downtime between trades that typically drags projects out for months.
The conversation dives into the operational shifts required to make this work, how they built buy-in from subcontractors, why niching into one type of project changed the entire business, and why the seven-day promise has become such a powerful differentiator in their market.
If you’ve ever wondered what remodeling would look like if the entire process were redesigned around speed, systems, and specialization, this episode is a fascinating look inside a radically different approach to construction.
00:00 — What
Seven Day
Kitchens actually is (and why people doubt
it)
02:10 — The real reason most remodels take 8–12
weeks
03:50 — Removing downtime between trades to compress
timelines
06:20 — Why the first kitchen took 5 weeks, but the second took
5.5
days
10:40 — The homeowner experience: why shorter projects create
happier clients
13:00 — The design process that eliminates change orders during
construction
18:00 — How they get subcontractors to buy into the
system
21:00 — Why niching into one type of project changed the
business
26:00 — The risk of shutting down a 10-year business to start
over
34:30 — The long-term vision: turning the model into a
franchise